Rough Edge interchange federal earmark
The parish's $7 million federal appropriation needs stage-zero consulting help — scope definition and environmental study — before HUD and DOTD will let the money move.
DOTD Transit Grant Application
The parish's first transportation plan update since 1998 was presented, built from over 1,400 resident survey responses, identifying 26 priority road projects, safety hot spots, and bike/pedestrian gaps. Formal adoption is planned for April, and the plan is the key to unlocking state and federal transportation funding.
Money Road striping and road safety
Jurors discussed dangerous night driving on unstriped parish roads like Monday Road, debating whether the parish should buy its own striping machine and whether lower speed limits could be a cheaper safety fix.
Aid to City of Grambling for ditch and street repairs
At Grambling's mayor's request, the parish will help with ditching and street repairs in the city.
Shady Grove Road Bridge replacement nears completion
The bridge is built but still awaits a load rating expected this week; extra paving on the approaches added $12,366.70 to the contract.
CIP Hot Mix Overlay project completed, including Grambling streets
During public comment, a juror relayed numerous calls from residents praising Public Works' recent road work, saying moving a school zone area and related improvements likely prevented accidents. A fuller report is expected at the next regular meeting.
Maintenance hot mix bid awarded
Amethyst Construction won the six-month hot mix supply bid at $115 per ton — up $5 from the last cycle — which the parish uses mostly for pothole patching.
Longstraw Road funding request
Resident Dennis Woods pressed jurors about the closed Longstraw Road, which forced church members and residents onto long detours. Officials explained the city of Ruston closed it after annexation in 2019 and said a future loop road in the new transportation plan is the fix — but that's years away.
Long-Range Transportation Plan Adoption
The jury made the parish's 20-year road plan official, which is the key step to qualify for federal and state funding. It covers road maintenance, safety, congestion, bike/ped paths — and a possible loop road that came up during public comment.
Spring Creek Road Bridge Replacement
The state will fully design and build the replacement of the Spring Creek Road bridge over Wafer Creek at no cost to the parish under the Off-System Bridge Replacement Program. Construction could start by late summer once bids are let.
Water Tank Road Speed Limits
The parish lowered the speed limit on Water Tank Road from 55 mph to 45 south of Fourth Street and 35 north of it, after a traffic study and complaints about dangerous traffic pulling onto Hwy 146. The lower limits give the sheriff's office a legal basis for enforcement.
Pea Ridge Road box culvert nearly done
The Pea Ridge Road box culvert is essentially complete but can't open until load-rating paperwork clears DOTD — frustrating for residents who've been waiting. Certifying substantial completion starts the 45-day clock for the contractor to get paid.